White paper · CIOs & decision-makers

Software outsourcing: give your roadmap more room to grow

Reduce costs, bring in the right skills and focus on your business: build a collaboration that supports your ambitions.

Fifteen practical benefits, budget simulations and guidance on supporting teams and managing risk.

Make more of your budget

Compare total costs and choose where to reinvest savings: development, testing or modernisation.

Bring in the right skills

Prepare an organisation that fits each stage of your product, with clear responsibilities and continuity arrangements.

Keep collaboration working

Share business context, support people and give difficulties a clear route to resolution.

Modular architecture illustrating the skills supporting a product vision.

Give your vision more capacity

Connect business ambitions with technical capacity.

A business may have a clear product vision but lack the means to deliver it: difficult recruitment, a constrained budget, missing skills or technical leaders absorbed by urgent issues. Outsourcing software development can help address these different situations.

The potential cost advantage opens several options: reduce spending, fund additional skills or combine both. A business can reinvest some of the savings in quality, application modernisation or features that have been postponed.

LughSoftware designs, develops and evolves software. Our organisation connects technical capacity with your business priorities through cooperation between your stakeholders, your Lugher in France and our delivery teams in India.

This approach goes beyond finding a lower daily rate. Deloitte’s 2024 global survey of more than 500 executives identifies cost, access to talent and agility among the motivations for outsourcing. Savings for an individual project must then be assessed through a total-cost comparison. Source: Deloitte, Global Outsourcing Survey 2024.

The guiding question: which organisation can deliver the improvements your business needs, with a clear total cost and understandable responsibilities?

How to read this document

Findings from external sources include links. The benefits discussed below analyse possible mechanisms: whether they materialise depends on the project and the chosen organisation. The simulation figures are illustrative assumptions. LughSoftware’s commercial commitments are those explicitly agreed in each proposal.

Back to contents ↑

Three paths towards modular structures, illustrating investment choices.

Fifteen benefits to consider

Save money, strengthen your skills or combine both.

01

Reduce the cost of comparable development work

A lower rate can reduce the budget needed to engage a team. Compare equivalent roles, availability and service levels, including the management and quality expected.

A 50% cost difference can be explored against a comparable external service in France. Savings are calculated for your scope, roles, coordination and included services; they do not automatically mean halving the total cost.

Example: retain the capacity needed for maintenance and improvements while reducing the budget allocated to development services.

02

Reinvest savings in a more complete team

Savings can fund roles or activities the project lacks: testing, project management, architecture expertise, deployment automation or user research.

A more complete team can address blockers that simply adding developers would leave unresolved. If deliveries are waiting for acceptance testing, strengthening QA may help more than starting additional features.

Example: keep two developers and add QA and coordination time using the cost difference.

03

Adapt team size to the project stage

Needs change between discovery, development, launch preparation and maintenance. An external arrangement can provide for capacity adjustments without requiring the client to recruit directly for every change.

This flexibility depends on practical terms: availability, minimum duration, notice, onboarding time and knowledge transfer. It requires preparation; it is not immediate.

Example: increase testing before a launch, then reduce that allocation when the product reaches a more stable phase.

04

Adapt skills as well as headcount

A migration, a mobile application and a performance assessment require different expertise. A partner can seek suitable people within its organisation or network, subject to availability.

The question becomes: “Which skill do we need at this stage?” A focused assignment may be enough when the need does not justify a permanent role.

Example: bring in a database specialist for an assessment, then let the regular team implement the fixes.

05

Widen your recruitment options

Working with a provider that recruits from a different talent pool creates another way to find skills. The client can also delegate part of the shortlisting and technical assessment.

The benefit depends on the provider’s actual ability to propose suitable people. No universal recruitment timeframe can be promised. Time to understand the product must still be allowed for.

Example: look for complementary expertise while the existing team continues delivering.

06

Focus on your project while we manage our people

LughSoftware manages its employees: recruitment, professional development, work organisation and their day-to-day working environment. This organisation supports the delivery of our software services.

You spend your time on priorities, business discussions and accepting results. Your project contacts work with you to organise follow-up and share the information needed.

Example: a business leader plans the next improvements with their project contact while LughSoftware manages and supports its employees.

07

Work with people equipped to do their best

At LughSoftware, every employee has the best possible equipment for their work. We give our teams the resources to work effectively and in good conditions.

LughSoftware takes care of equipment choices and the working environment. These resources are part of the service, allowing your discussions to focus on the progress of your software.

Example: developers and testers use equipment suited to their tasks while your team focuses on features and expected outcomes.

08

Free up time for customers and the product

Management can give more attention to users, sales, partnerships and strategy when technical delivery has clearly identified leadership.

You still need to decide what should be built and accept the results. Outsourcing works better when the client appoints someone who can answer business questions and decide priorities.

Example: organise regular demonstrations and prepared decisions instead of involving the business leader in every operational difficulty.

09

Reduce some causes of delay

Additional capacity can allow sufficiently independent work to run in parallel: interfaces, APIs, testing or documentation. It can also relieve the internal team of some maintenance work.

The result depends on the real bottleneck. If it is a business decision or a technical dependency, adding people will not be enough. Measure the time needed to deliver an accepted feature.

Example: assign routine improvements to a defined team while internal experts prepare a new architecture.

10

Make some financial commitments more adjustable

A contract can organise capacity by period, provide for scaling up and define the conditions for reducing or ending the engagement. This helps the business align spending with foreseeable needs.

Flexibility depends on the signed commitments: notice, minimum volumes, transition costs and fixed duration. A non-reducible annual service can still be a significant fixed cost.

Example: fund a clearly bounded first stage, then decide on the next one based on the results.

11

Access an established organisation without opening your own office

An established partner can provide premises, management, working tools and administration. The client does not need to create its own local entity to begin the collaboration.

These resources are funded through the service; they are not free. The benefit comes from sharing them and from the setup work the client does not have to undertake.

Example: start with a small team before considering a larger organisational investment, if it becomes appropriate.

12

Organise continuity beyond one individual

The provider can prepare handovers, documentation and knowledge sharing. These practices make absences and changes in personnel easier to manage.

Replacing a person alone does not guarantee continuity. People need to understand the product, have the necessary access and be able to take over delivery procedures. These elements must be maintained throughout the engagement.

Example: document a critical module and arrange a review by a second person before an absence makes maintenance difficult.

13

Fund more consistent quality

Savings can make dedicated QA time, code reviews and recurring checks possible. The project then has allocated time to verify deliverables and address defects.

These practices must be planned, performed and followed up. A team’s location is not evidence of quality; observable results and acceptance criteria are more useful.

Example: define the essential user journeys to check at every release and reserve time to fix the defects found.

14

Test more ideas with limited exposure

A small assignment can test an assumption before committing to a full programme: a prototype, a technical proof of concept or a limited integration. The client retains the option to redirect investment after this first stage.

The work should produce useful decision-making information: feasibility, user behaviour, constraints or estimated cost. Building up prototypes without decision criteria can instead spread the budget too thinly.

Example: test an integration with a third-party system before rebuilding an entire business process.

15

Make cooperation and responsibilities more explicit

Working with another organisation can encourage clearer requirements, decisions, responsibilities and acceptance of deliverables. A well-designed framework makes it easier to see what is progressing, what is blocked and what still needs a decision.

The framework should remain proportionate. Too many meetings and documents can consume the expected gain. A few shared documents and a clearly identified coordination contact may be enough to start.

Example: a shared backlog of priorities, a software demonstration, a list of blockers and an explicit decision on the next step.

Back to contents ↑

Two connected modular platforms illustrating different levels of development capacity.

Understand the “25% less budget, 50% more capacity” scenario

Compare budget and available capacity using your assumptions.

The scenarios at a glance

What balance between budget and capacity?

Budget · baseline 100

0100
Baseline
100
Savings
50
Balanced
75
Capacity
100

Equivalent capacity

08
Baseline
4
Savings
4
Balanced
6
Capacity
8
Balanced scenario6 equivalent roles instead of 4Budget: 75 instead of 100
Simulation: comparable unit cost halved, over the same period and with the same availability. Any additional costs not included must be added. Headcount alone does not measure output.

A mathematical possibility under stated assumptions

Suppose four comparable resources represent a baseline budget of 100 over a given period. Also suppose their comparable unit cost is halved through the outsourced organisation.

OptionEquivalent capacity engagedBudget, baseline 100Budget changeCapacity change
Baseline situation4100——
Prioritise savings450−50%0%
Balance savings and added capacity675−25%+50%
Prioritise capacity81000%+100%

The intermediate scenario follows the calculation 1.5 × 0.5 = 0.75. In theory, it funds six equivalent resources instead of four with 75% of the original budget.

This is a simulation, not a practice shown to be widespread by the sources consulted. The table assumes a comparable period, availability and mix of skills, with costs that change proportionally. A real team must be costed role by role.

A 50% increase in capacity does not guarantee 50% more features or productivity. Onboarding, coordination, the clarity of requirements and dependencies all affect the outcome.

The impact of additional costs

If the six-resource scenario costs 75 but requires another 10 for coordination or transition not already included, the total cost rises to 85. The actual saving is then 15%.

To retain a ceiling of 75 with the same additional 10, only 65 remains for delivery resources. In this simplified model, one equivalent resource costs 12.5, so the capacity funded becomes 65 ÷ 12.5 = 5.2 equivalents, or 30% more than the original four. This equivalent can represent part-time allocations; it is not a real team of “5.2 people”.

Commercial communication should therefore distinguish the rate difference, total-cost savings and the capacity actually funded.

Back to contents ↑

Layered structure illustrating the components of total cost.

Calculate savings using total cost

Include all costs to assess the savings.

Illustrative example · baseline 100

Total cost changes the savings achieved

Baseline organisation100

Outsourced scenario85

751015
  • 75 · Delivery
  • 10 · Additional coordination / transition
  • 15 · Remaining saving
75 + 10 = 85Net saving: 15%
Based on the previous chapter’s scenario. The additional 10 units are an assumption; a cost already included must not be counted twice.

The method compares two organisations over the same time horizon and for a comparable expected outcome. The UK guide The Sourcing Playbook recommends including transition, mobilisation and operating costs in the assessment. It is a methodological reference for UK public procurement, not a French rule or evidence of LughSoftware’s savings. Source: Cabinet Office, The Sourcing Playbook.

The following checklist is proposed for LughSoftware software projects:

Cost itemQuestion to ask in both scenarios
DeliveryWhich roles, at what rates and for how many days actually allocated?
Management and coordinationHow much project manager, technical lead and Lugher time?
QualityWhich tests and what arrangements for fixing defects?
SetupWhat effort is needed for access, product understanding and initial knowledge transfer?
Technical resourcesWhich equipment, licences, tools, environments and cloud costs?
Client contributionHow much business, product, technical and acceptance time is still needed?
ContinuityWhat arrangements cover absences, replacements and handovers?
Ending or reducing the engagementWhat notice, minimum commitments and handover costs apply?

Total outsourced cost = provider charges + costs retained by the client + transition and exit costs not already included.

Net saving = (baseline total cost − outsourced total cost) ÷ baseline total cost.

A cost already included in the price must not be added again. Internal time should be distinguished from cash outflows: it can be valued when comparing organisations without creating an additional invoice.

For a comparison with hiring employees, build a separate scenario with its own assumptions. The daily rate of an external consultant in France and an employee’s salary are not the same basis for calculation.

Back to contents ↑

A workstation with two screens in a software development workspace.

A software partner that manages its own organisation

Illustration: a working environment designed for delivery and quality.

LughSoftware supports the design, development and evolution of your applications. We organise our employees’ contributions as part of our software services, with responsibilities and follow-up defined for your project.

You have named contacts to share priorities, review deliveries and prepare the next stages. LughSoftware takes care of supporting its teams and their working environment.

Every employee benefits from the best possible equipment for their work. This attention to working conditions gives our teams the means to focus on delivery and the quality of the results.

You retain your product vision and gain time for your customers, your business and its growth.

Back to contents ↑

Illustration of cooperation between teams in France and India.

France–India: an organisation that fits your project

Illustration: sharing context in both directions.

Cooperation between France and India allows work to be organised around your priorities. Your Lugher facilitates communication and shares context with the delivery teams.

Together, we define availability, overlapping working hours and the rhythm of follow-up. The time difference can then be built into the organisation to prepare work, share progress and support decisions.

The right skills, organised communication and a roadmap moving forward.

Back to contents ↑

Software architecture evolving towards new components in stages.

Reduce financial risk by defining commitments

Progress in stages and decide based on results.

Outsourcing can reduce the amount committed before the first result, make some costs more predictable and allow decisions in stages. These benefits are particularly relevant when demand, funding or product scope remains uncertain.

Risk allocation must remain realistic. The Cabinet Office’s guidance on pricing and risk notes that poorly suited risk transfer can increase the price requested. It recommends assigning risk to the party best placed to manage it. This methodological principle is not a rule of French law. Source: Cabinet Office, Risk Allocation and Pricing Approaches.

For a software project, the following negotiation checklist is proposed:

01

Define

Define an initial scope and criteria that support the decision.

02

Review

Examine results, spending and remaining risks.

03

Decide

Extend, adjust or stop according to the results and the contract.

Risk or uncertaintyArrangement to considerIntended effect
Requirements remain uncertainA bounded first stage and an explicit decision before expandingLimit the initial investment
Budget overrunUpdated estimates, spending reviews and agreement on additional workAvoid unanticipated spending
Reduced demandNotice periods and rules for reducing capacityAdjust future commitments
Rate increases or exchange-rate changesBilling currency and price revision rulesMake the budget predictable
Insufficient deliverableAcceptance criteria and defect-handling arrangementsKnow what is expected and owed
A team member leavesHandover, access and replacement arrangementsReduce disruption
Provider failureAccess to the necessary assets and a recovery planPreserve the ability to continue
End of the collaborationHandover, documentation, assistance and exit chargesSupport an organised transition

The business retains the risk associated with its product’s commercial success. A technical partner can help execute a strategy; it does not guarantee market demand. Budget control should also be considered alongside quality and time to results.

Back to contents ↑

Sculptural figures talking around a table, illustrating listening and collaboration.

Prevent people and organisational risks

Illustration: listening, explaining and sustaining cooperation.

Support the people behind the work

An outsourced collaboration can weaken if it consists only of assigning a scope and waiting for delivery. People need to understand users, product goals, priorities and the reasons behind decisions. They also need support, useful feedback and available contacts when difficulties arise.

Work can meet the written request yet miss the real need if context has not been shared. A difficulty can remain invisible if nobody takes the time to listen. These are risks to prevent; they do not establish a general failure rate for outsourcing.

Entrusting software delivery to another team requires a shared understanding and an active working relationship.

Understand the social aspects of cooperation

Working language, attitudes to hierarchy, ways of expressing disagreement, recognition and a sense of belonging can all influence communication. It helps to ask how each person understands a decision, prefers to receive feedback and can raise a blocker.

This understanding is developed with the people involved. Their country does not determine their behaviour. Silence calls for an open question; agreement calls for checking the expected outcome. Asking for help or challenging an estimate needs a place in the project’s working arrangements.

Identify difficulties and act early

RiskSigns to explore with the teamResponse to organise
Insufficient shared business contextDeliverables follow the tickets but do not meet actual usage needsExplain user journeys, provide examples and ask the team to restate the requirement
Insufficient support for employeesDifficulties recur without a contact or follow-up actionName a person responsible for support and arrange useful one-to-one conversations
Difficulty raising disagreement or blockersFew questions, quick agreement and problems discovered lateInvite concerns, welcome warnings and clarify how they will be handled
Isolation or declining involvementLess participation, contributions going unrecognised and decisions poorly understoodShare context, recognise contributions and involve people in relevant discussions
Poorly managed workload or prioritiesRepeated emergencies, conflicting decisions and declining qualityReview workload and priorities with the people responsible
Communication concentrated on one personIssues remain blocked during their absenceArrange backup contacts, record decisions and share knowledge

These signs are reasons to start a conversation. They are not enough to conclude that someone lacks commitment or is experiencing personal difficulties.

Maintain support for people and delivery

An organisation suited to the project may include:

  • An induction covering the product, its users, the team and responsibilities.
  • One-to-one conversations with the designated manager about workload, difficulties and development needs.
  • Demonstrations with specific feedback, including what is working well.
  • Team discussions to examine misunderstandings and improve cooperation.
  • Follow-up on agreed actions, with a named owner and a next deadline.

Frequency and contacts should be defined for the engagement. Good equipment provides an important foundation; listening, shared context and the quality of relationships complete the conditions for effective delivery.

The role of the Lugher and LughSoftware management

Client

Vision & priorities

Business context, decisions and feedback on delivery.

Your Lugher

Shared understanding

Sharing context and coordinating France–India communication.

LughSoftware management

Support for people

Listening, workload, development and addressing difficulties.

Project team

Delivery & quality

Organisation, development and verification of deliverables.

The Lugher helps business and technical stakeholders understand each other. They can bring misunderstandings to light, share context in both directions and help involve the right contact. They work alongside the project manager and the people responsible for supporting LughSoftware employees.

Schedule tracking, listening to people and technical decisions require identified responsibilities. The client contributes by explaining priorities, answering questions and providing feedback on the work. LughSoftware organises support for its employees as part of its software services.

The practices in this section form an organisational framework to adapt to the project. They make an essential point concrete: successful cooperation depends as much on understanding and support as on defining the scope.

Back to contents ↑

Connected software services, illustrating coordination and continuity.

Turn additional capacity into results

Coordinate skills around useful outcomes.

Choose the model that fits the need

ModelWhen it is a good fitResponsibility retained by the client
Team extensionA team and management are already in place; a skill or additional capacity is missingPriorities, integration with existing work and management as defined in the contract
Dedicated teamThe product evolves over time with recurring needsProduct vision, decisions and acceptance of results
Turnkey softwareAn initial scope and acceptance criteria can be describedRequirements validation, business decisions and acceptance

The choice can evolve with the project. A dedicated team can begin with scoping; a delivered project may then need maintenance arrangements. The conditions for each phase must be defined.

Clearly identified responsibilities

RoleContribution to organise
Client business or product ownerVision, priorities, business rules, decisions and acceptance
LugherShared understanding of requirements, context sharing and France–India coordination
Manager responsible for supporting LughSoftware employeesListening, workload reviews, development and addressing difficulties in connection with the project
Project managerPlanning, progress, dependencies and follow-up of open issues
Technical leadArchitecture, consistency of technical choices and technical reviews
DevelopersDelivery and maintenance of the agreed scope
QA / testerPreparing checks, running tests and following up defects

The Lugher facilitates understanding and communication. Their involvement should have an explicit allocation of days and be coordinated with the project manager and technical lead. Whether these roles are included depends on the selected service.

Day-to-day arrangements may include a shared workspace, grouped questions, visible blockers and overlapping working hours. Regular demonstrations support decisions based on the software delivered. Working arrangements and availability are agreed with you in the selected proposal.

Measure what matters to the client

A sufficiently representative first scope helps compare expectations with results. Record a baseline, then track a few useful indicators:

IndicatorQuestion it answers
Time from a ready requirement to an accepted deliveryAre improvements arriving faster?
Accepted deliverables and significant defectsDoes quality meet the need?
Budget spent and estimated remaining workIs spending still under control?
Time spent by the client’s contactsIs cooperation reducing their workload?
Ability to take over a module or release independentlyIs continuity improving?

Avoid measuring value solely through headcount, hours, lines of code or closed tickets. Compare work of a similar nature and examine the reasons for differences before changing capacity.

Back to contents ↑

Layers of protection integrated into an application architecture.

Retain control of your product and data

Prepare access, continuity and product handover.

A prospective client may reasonably ask whether they will become dependent on their provider. The answer lies in practical arrangements: defined usage and intellectual property rights, access to the necessary repositories and environments, documentation, recorded decisions and handover terms.

Continuity should be prepared from the start. The Sourcing Playbook covers mobilisation, contract exit and knowledge transfer, among other topics. Source: Cabinet Office, The Sourcing Playbook.

Data protection must also be assessed against the actual working arrangements. The CNIL explains mechanisms for governing transfers of personal data outside the European Union, including standard contractual clauses. The data used, processing locations and access from abroad must be examined to determine appropriate arrangements. Source: CNIL, Transferring data outside the EU (in French).

For the project, specify authorised access, the data needed for testing, secrets management and incident responsibilities. These topics must be addressed for the agreed scope; this document claims no certification, comprehensive compliance or absolute security.

Back to contents ↑

A book and translucent documents in a library, illustrating sources and reference points.

Sources and references

References to inform decisions and clarify assumptions.

The references below explain outsourcing motivations, cost comparisons and how cooperation can be organised. The simulations are illustrative and are not based on client data.

The Cabinet Office guides are used as methodological references. The benefits, checklists and cooperation practices proposed in this white paper should be adapted to your project. Applicable commitments are specified in your proposal and contract.

Back to contents ↑